On Saturday after we met with someone about the built-ins, we did our Saturday walk through. A lot of times when I drop by after work, I have E with me... so I don't really look at much with detail and go quickly through while she is wanting to "walk" all over and see the "pink" wood.
I think I have maybe posted this picture a few times - or at least one that is pretty close. This is from the front entry way looking into the kitchen, every time I walk in - I am so happy that it is now so much more open than it was before:
Here is the new window in the stair way -- so much light comes into the house from this window:
The 4th bedroom now has the window installed:
And the windows are installed in our bathroom.
The siding in the court yard is now complete and I am so happy with the way it looks:
Finish the dormer windows in the courtyard and framing them in:
Here is a view of both of dormer windows now completed (these are in our bathroom) -- you can also see where they added on to the roof line in 1980:
Another court yard view:
Tons of progress has been made to the west side of the house - the siding is now almost complete:
And the sun room (west side):
The balcony is also being worked on and here is the progress on that:
All and all I am so happy with all the updates that have been (and continue to be) made at the house. I thought roofing was supposed to start this week - but the weather forecast calls for a lot of rain, so I am not sure about that. I also think they are going to be working on electrical... we will see.