Saturday, February 2, 2013

Picture Update!

Progress continues to be made at the house each day, and I love seeing the pics Brian takes of everything going on.
When I went by the house on Thursday, I didn't get any pics of the outside of the house with the windows removed, but Brian did:
On Wednesday, they started taking down the siding from the "workshop"/storage area on the side of the car port:
This is a picture of the sun room with the windows framed in, before the plywood went up (which goes beneath the siding):
In this picture - you can see some of the progress made with the plywood up at the back of the house and the sunroom area:
Plumbing starts on Monday, and they have framed out our shower in the master bathroom area... including our bench:
And the bathtub in our bathroom:
Here are a few more pictures of our ceiling in our room, plus the room all cleaned up... I know probably not that interesting, but it really looks great:
One of the things that makes the vaulting of our ceiling so cool is the slope of the roof that goes all the way down (which you can kind of see in this picture).... the door way is the entry to my desk space:
Habitat was back out to pick up all the windows that had been removed from the house... it is hard to believe how much stuff has come out....

No comments:

Post a Comment