There has been a lot of progress made over the past couple of days at the house... especially to the outside.
Thursday Update (2/7)
Since they were able to install the windows we already had gotten for the workshop and sunroom, they started on the siding back there. The rest of the windows were supposed to be delivered earlier in the week, but had not yet arrived, however this did not stop the crew from continuing to make progress. We both really appreciate that when something is delayed, they just sort of shift and continue to move forward on things that can be done. Our contractor has been great at really making sure the project is moving forward -- hopefully this means we will be in by close to our target date.
A lot of work was done to the car port to replace the siding on the workshop and also replacing the rotted out beams in that area. It is amazing how different everything is starting to look:
They also replaced the siding on the sunroom, since those windows had already been installed:
Friday Update (2/8)
On my "way" home from work, I decided to drive past the house and see if the windows had been delivered and installed. I was just "slightly" excited to see how the new windows looked. Much to my surprise (and excitement), they had been delivered and at least I knew that the front windows had been installed. Since I was in work clothes - I did not go in, but snapped a few pictures from the street.
Brian and I decided to go with 6 over 1 windows for majority of the house and I am really happy with the way they look:
After my "drive-by" visit to the house, Brian actually went to the house to check on the progress... and get a few pictures of some of the installed windows. The back of the house is starting to look really different:
Here are three of the four kitchen windows installed:
And some of the other windows that look into the court yard:
E's Room also has her egress window installed.... I guess you could call it her escape to the balcony:
After I went home and changed, based on Brian's report... I decided to go back to the house to see all the progress. Now when we drive up to the house - E says... "hooous" and gets excited. She doesn't want to be left out and always wants to go inside. When we get inside - she LOVES all the "piiiiink" wood throughout the house. Brian was upstairs when we walked in and from the opening snapped a picture of us.
Saturday Update (2/9)
This weekend the crew worked a half day and continued to make progress on both installing windows and the siding. We didn't bring the camera with us - so I only have a few pictures from my phone.
Love the way the 4 kitchen windows look:
And all the progress at the back of the house:
Here is the only picture I took of the inside. Love how open it now is and the full length windows:
Brian and I also tackled picking out most of our plumbing fixtures because the plumber needs our selections to get and install the valves behind the walls. Because we have been working on this project for so long and have spent tons of time researching and picking stuff out either through our NUMEROUSE visits to showrooms or even online... the process was much easier when we went to Ferguson to look at fixtures today. We actually got through most of it and selected what we needed. Not sure if you have ever been to any of the show rooms... but let's just say the selection process can be VERY overwhleming. After dinner we also wandered around Home Depot, hoping we would get a few tile ideas... not much, but as you can tell the house is very much on our minds and pretty consuming!
Think I am finally caught up on all the updates... until more work is done on Monday! Looking forward to seeing the rest of the windows installed and the next steps of progress made to the house!
Sunday, February 10, 2013
Friday, February 8, 2013
Ch-ch-changes!!!
Sorry for the lack of updates in the past few days... the crew was off for the weekend, so after I last updated there were not tons of pictures or updates. Then on Monday, Brian was super tied up with work and didn't make it to the house -- crazy right! And then, I think I just got busy with a lot of work (and/or E) stuff....so NOW - I am finally getting caught up on the blog! I have also been working on selecting appliances and some of the other things we are going to have to start ordering. Lots of big decisions to make. Any recommendations are gladly accepted!
In any case, sorry for the delays and lack of posts, promise to not have it happen again. There have been a lot of changes over at the house - rough plumbing is in and we PASSED our plumbing inspection -- Woo Hoo! I believe electrical is in (or being worked on)... and there is a lot being done to the outside back of the house. I believe most of the framing is complete and we are still waiting on the delivery of the windows. For the sun room and work shop our builder had some spare windows he was looking to unload, so we went with those... as such, they are the first windows in the house. Here are some pics from this weeks progress:
New windows and walls inside of the sunroom, it used to have only screens and unfortunately, most of them were all messed up... we now have a wall of windows that looks out to the side of the house. This room is not under a/c, but will be a great "play space" for little E! I cannot wait to do something creative and fun with this space... for now here is what it looks like:
And here is the view from the outside, they have pulled down all the old siding and rotted out wood on the sun room:
The back of the house which is being prepared for the siding to go up:
The front of the house has also taken on a different look with all the windows removed. With the windows and siding down, the window areas are covered with plywood, cannot wait for the new windows and see what they will look like installed... in the right side of the picture you can also see the bobcat that arrived at the house:
Here is what the bobcat was doing.... getting rid of all the pavers and concrete in the courtyard.... while we will still have courtyard... this space was one that was causing a lot of issues in the house. It was built up too high and the slant of it meant everything was draining toward the center of the house. We are keeping a small bit of concrete under the balcony, but the rest will be our "green" space. The way the house was designed it utilizes majority of the property for the house - BUT between some green space, the LONG narrow driveway for bikes and such and the sunroom.... I think E will be able to enjoy playing outside!
More courtyard progress:
And here is the muddy mess that is left behind... of course we had some rain this week - which has only created a HUGE mess (according to Brian) from the mud pit. Anyone up for some mud wrestling!?
I cannot wait to get to the house this weekend -- it has been a week since I have been over there... promise for updates as I get them! Have a wonderful Friday!
In any case, sorry for the delays and lack of posts, promise to not have it happen again. There have been a lot of changes over at the house - rough plumbing is in and we PASSED our plumbing inspection -- Woo Hoo! I believe electrical is in (or being worked on)... and there is a lot being done to the outside back of the house. I believe most of the framing is complete and we are still waiting on the delivery of the windows. For the sun room and work shop our builder had some spare windows he was looking to unload, so we went with those... as such, they are the first windows in the house. Here are some pics from this weeks progress:
New windows and walls inside of the sunroom, it used to have only screens and unfortunately, most of them were all messed up... we now have a wall of windows that looks out to the side of the house. This room is not under a/c, but will be a great "play space" for little E! I cannot wait to do something creative and fun with this space... for now here is what it looks like:
And here is the view from the outside, they have pulled down all the old siding and rotted out wood on the sun room:
The back of the house which is being prepared for the siding to go up:
The front of the house has also taken on a different look with all the windows removed. With the windows and siding down, the window areas are covered with plywood, cannot wait for the new windows and see what they will look like installed... in the right side of the picture you can also see the bobcat that arrived at the house:
Here is what the bobcat was doing.... getting rid of all the pavers and concrete in the courtyard.... while we will still have courtyard... this space was one that was causing a lot of issues in the house. It was built up too high and the slant of it meant everything was draining toward the center of the house. We are keeping a small bit of concrete under the balcony, but the rest will be our "green" space. The way the house was designed it utilizes majority of the property for the house - BUT between some green space, the LONG narrow driveway for bikes and such and the sunroom.... I think E will be able to enjoy playing outside!
More courtyard progress:
And here is the muddy mess that is left behind... of course we had some rain this week - which has only created a HUGE mess (according to Brian) from the mud pit. Anyone up for some mud wrestling!?
I cannot wait to get to the house this weekend -- it has been a week since I have been over there... promise for updates as I get them! Have a wonderful Friday!
Saturday, February 2, 2013
Picture Update!
Progress continues to be made at the house each day, and I love seeing the pics Brian takes of everything going on.
When I went by the house on Thursday, I didn't get any pics of the outside of the house with the windows removed, but Brian did:
On Wednesday, they started taking down the siding from the "workshop"/storage area on the side of the car port:
This is a picture of the sun room with the windows framed in, before the plywood went up (which goes beneath the siding):
In this picture - you can see some of the progress made with the plywood up at the back of the house and the sunroom area:
Plumbing starts on Monday, and they have framed out our shower in the master bathroom area... including our bench:
And the bathtub in our bathroom:
Here are a few more pictures of our ceiling in our room, plus the room all cleaned up... I know probably not that interesting, but it really looks great:
One of the things that makes the vaulting of our ceiling so cool is the slope of the roof that goes all the way down (which you can kind of see in this picture).... the door way is the entry to my desk space:
Habitat was back out to pick up all the windows that had been removed from the house... it is hard to believe how much stuff has come out....
When I went by the house on Thursday, I didn't get any pics of the outside of the house with the windows removed, but Brian did:
On Wednesday, they started taking down the siding from the "workshop"/storage area on the side of the car port:
This is a picture of the sun room with the windows framed in, before the plywood went up (which goes beneath the siding):
In this picture - you can see some of the progress made with the plywood up at the back of the house and the sunroom area:
Plumbing starts on Monday, and they have framed out our shower in the master bathroom area... including our bench:
And the bathtub in our bathroom:
Here are a few more pictures of our ceiling in our room, plus the room all cleaned up... I know probably not that interesting, but it really looks great:
One of the things that makes the vaulting of our ceiling so cool is the slope of the roof that goes all the way down (which you can kind of see in this picture).... the door way is the entry to my desk space:
Habitat was back out to pick up all the windows that had been removed from the house... it is hard to believe how much stuff has come out....
And the windows are gone....
On Thursday, Brian was in Austin for work, so I went by the house during my lunch to see what was going on and report back to Brian. When I drove up, I noticed that all the windows had been taken out -- it was pretty weird to see the house with no windows. The builder also mentioned that the new windows would be in on Tuesday - I cannot wait to see how they look. Also, I finally got to see the new ceiling in the master. Wow - the pictures do not do it justice!! It really makes the room look open and so much larger. I wasn't at the house for long, so just took a few pics on my phone before heading back to share with Brian (and of course all of YOU - the readers of the blog). Here are the pics of the house with no windows...
The front of the house with no windows (living room area):
f
Brian's office with the windows removed:
And the courtyard:
Here are some of the removed windows.... all will be donated to Habitat for Humanity:
Need to upload all the pics Brian took from the end of the week... will do that this weekend and share all the pictures!!!
The front of the house with no windows (living room area):
f
Brian's office with the windows removed:
And the courtyard:
Here are some of the removed windows.... all will be donated to Habitat for Humanity:
Need to upload all the pics Brian took from the end of the week... will do that this weekend and share all the pictures!!!
Wednesday, January 30, 2013
Up - Up - Up!!!!
As I mentioned in my post yesterday, from my crazy idea one afternoon at the house, we decided we would vault the ceiling in our master bedroom. It is an old house, so by today's standards - the ceilings are low throughout the house (8ft) and I thought it would really open up the master bedroom and give it more character. Yesterday, they finished framing it and while I haven't seen it in person... I am really happy with our decision... what do you think?
In addition to finishing up our ceiling, yesterday they also framed the bathroom for the 4th bedroom. This bathroom crosses between where the 1939 and 1980 houses meet - so while the 4th bedroom was one of the first spaces to be framed, they had to wait until the beams below were put in and everything was supported before the actual bathroom could be framed. Matter fact, over the weekend when I was there - you were basically just walking on a plank to get to the front of the house where our master bedroom/bathroom/closet are. Yesterday, they completed that bathroom... this picture was taken from our bedroom looking at the bathroom:
From what Brian said, they are getting close to finishing up the framing and everything looks good. I cannot wait to see it! We are waiting for the windows to come in so those can go be installed... and I think next up is plumbing and then electrical... not 100% sure about that... but as long as it is forward progress that is all that matters to me. Will keep you posted as I get details from Brian!
In addition to finishing up our ceiling, yesterday they also framed the bathroom for the 4th bedroom. This bathroom crosses between where the 1939 and 1980 houses meet - so while the 4th bedroom was one of the first spaces to be framed, they had to wait until the beams below were put in and everything was supported before the actual bathroom could be framed. Matter fact, over the weekend when I was there - you were basically just walking on a plank to get to the front of the house where our master bedroom/bathroom/closet are. Yesterday, they completed that bathroom... this picture was taken from our bedroom looking at the bathroom:
From what Brian said, they are getting close to finishing up the framing and everything looks good. I cannot wait to see it! We are waiting for the windows to come in so those can go be installed... and I think next up is plumbing and then electrical... not 100% sure about that... but as long as it is forward progress that is all that matters to me. Will keep you posted as I get details from Brian!
Tuesday, January 29, 2013
Wide Open Spaces!
Things were quiet at the house this past weekend.... they wanted to give me the opportunity to get caught up from my lack of blogging for a few days.... Actually, as I mentioned our G.C. was sick with the flu late last week and on Friday his head framer was also sick, as was a lot of the crew, so they took the weekend off. Hope everyone gets well soon.
As the new beams were put in to brace and support the ceilings there were many "pony" walls (I think that is what they are called, or at least what I have heard Brian call them) up throughout the house, so while you could tell that the spaces were much more open, the views were still obstructed. Yesterday, they were finished putting in many of the support beams downstairs -- now we really have a wide open space in the downstairs of the house:
What is pretty cool is this picture is taken from the back of the hosue (in what will be the mudroom) and you can see all the way across the house and see that the front door is open - Love how open it will be:
Standing in the 'breakfast area' and looking into the dining room:
So one of my crazy ideas when they first took out the ceiling in the back of the house was that we had to figure out a way to make use of all the extra space up there.... I mean I know it is attic space, but still, I thought it would look really cool if we raised the ceiling in the master bedroom... or did something with the space... so I suggested it to the builder. He said he would talk to the framer, but that it made sense and shouldn't be that difficult. Our master bedroom is not a "huge" room and I felt like doing this would make it feel larger. We debated it, but ultimately decided that it was worth it... well, I decided it was worth it and Brian agreed... probably every night before we go to bed - Brian will look up at the ceiling and say "Was this really worth X?" and I will say - "Yes - I think it is" It is sort of hard to tell in these pictures... but here are some pics from the progress they made on it:
Think that's about all that was going on at the house yesterday... they are getting closer to finished with framing... and I am finally almost all caught up from my lack of blogging!
As the new beams were put in to brace and support the ceilings there were many "pony" walls (I think that is what they are called, or at least what I have heard Brian call them) up throughout the house, so while you could tell that the spaces were much more open, the views were still obstructed. Yesterday, they were finished putting in many of the support beams downstairs -- now we really have a wide open space in the downstairs of the house:
What is pretty cool is this picture is taken from the back of the hosue (in what will be the mudroom) and you can see all the way across the house and see that the front door is open - Love how open it will be:
Standing in the 'breakfast area' and looking into the dining room:
So one of my crazy ideas when they first took out the ceiling in the back of the house was that we had to figure out a way to make use of all the extra space up there.... I mean I know it is attic space, but still, I thought it would look really cool if we raised the ceiling in the master bedroom... or did something with the space... so I suggested it to the builder. He said he would talk to the framer, but that it made sense and shouldn't be that difficult. Our master bedroom is not a "huge" room and I felt like doing this would make it feel larger. We debated it, but ultimately decided that it was worth it... well, I decided it was worth it and Brian agreed... probably every night before we go to bed - Brian will look up at the ceiling and say "Was this really worth X?" and I will say - "Yes - I think it is" It is sort of hard to tell in these pictures... but here are some pics from the progress they made on it:
Think that's about all that was going on at the house yesterday... they are getting closer to finished with framing... and I am finally almost all caught up from my lack of blogging!
Monday, January 28, 2013
Trash Talk...
On Thursday we had filled yet another dumpster... so they changed it out again. This is dumpster number 5 or 6 (I think):
Speaking of "waste" -- the Port-O-Potty was also delivered to the house...eek. And no our contractor is not just wearing a mask because of the smell of the Port-O-Potty... but he actually was in the hospital on Wednesday night for the flu, but is so dedicated to the project, that he was out at the house making sure everything was going as to plan... if that is not dedication, I don't know what is! Thank you Rufino and Get Well Soon!
Thought this was a cool picture, Brian not only takes a ton of pictures of the progress at the house, but sometimes in the mix, I find some really cool "artistic shots" -- this one shows the plans and the window in the entry way before it was removed. Because of the new design, there will no longer be a window here:
And now the window is gone and has been removed:
Not sure how secure this small bit of bricks is at the corner of the 1939 and where the addition in 1980 was added... but Brian will tell you, the brick is about to fall over and is not very secure at all:
The foundation company had to come back and fix some issues that had not been corrected initially when they did the work 6 months or so ago...
In the kitchen you can also see all the temporary supports being used as the new beams are going in to support the second story of the house.
The roof now also has additional support to make sure it stays on the house... good thing... right!? Apparently there was very little actually holding the roof on... living where hurricanes can happen, glad we now have a secure roof!
View from the living room across to Brian's study, which is now fully framed:
In the playroom there were shelves on either side of the fireplace, our intention was to just refinish these... but our contractor felt like that was going to be a bigger headache... so he went ahead and removed them and we will start over:
Upstairs in the hallway, we are reusing the windows that were already there... we even have an additional window that had not ever been used that was found in the attic which matched the 3 already in the hallway.... the new space for these windows has now been framed:
Here is the view of both the upstairs windows framed and the downstairs one from the courtyard... very happy with the progress:
And finally another picture of all the framing that is now complete on the second floor:
Slowly, but surely we are making progress at the house!!
Speaking of "waste" -- the Port-O-Potty was also delivered to the house...eek. And no our contractor is not just wearing a mask because of the smell of the Port-O-Potty... but he actually was in the hospital on Wednesday night for the flu, but is so dedicated to the project, that he was out at the house making sure everything was going as to plan... if that is not dedication, I don't know what is! Thank you Rufino and Get Well Soon!
Thought this was a cool picture, Brian not only takes a ton of pictures of the progress at the house, but sometimes in the mix, I find some really cool "artistic shots" -- this one shows the plans and the window in the entry way before it was removed. Because of the new design, there will no longer be a window here:
And now the window is gone and has been removed:
Not sure how secure this small bit of bricks is at the corner of the 1939 and where the addition in 1980 was added... but Brian will tell you, the brick is about to fall over and is not very secure at all:
The foundation company had to come back and fix some issues that had not been corrected initially when they did the work 6 months or so ago...
In the kitchen you can also see all the temporary supports being used as the new beams are going in to support the second story of the house.
The roof now also has additional support to make sure it stays on the house... good thing... right!? Apparently there was very little actually holding the roof on... living where hurricanes can happen, glad we now have a secure roof!
View from the living room across to Brian's study, which is now fully framed:
In the playroom there were shelves on either side of the fireplace, our intention was to just refinish these... but our contractor felt like that was going to be a bigger headache... so he went ahead and removed them and we will start over:
Upstairs in the hallway, we are reusing the windows that were already there... we even have an additional window that had not ever been used that was found in the attic which matched the 3 already in the hallway.... the new space for these windows has now been framed:
Here is the view of both the upstairs windows framed and the downstairs one from the courtyard... very happy with the progress:
And finally another picture of all the framing that is now complete on the second floor:
Slowly, but surely we are making progress at the house!!