At the end of the day what you notice about a house are the finish details and not what is behind the walls... don't get me wrong, all that has been done to this point is important ... and that is why we did it all, but that is not what most people notice when they go into a home because they cannot see it. So far -- all the details have come together pretty close to what my vision was and I am very excited about that... Tile work and carpentry work has been the focus of the past few days... or weeks!! After getting home last weekend and showering, seeing E and Brian, I was ready to see the progress at the house in person! No surprises because everyone had sent photos while I was away, but it was confirmation of how well everything was coming together. Things over the next few weeks may be a little slow because the main cabinetry in the house has been held up... hopefully, it doesn't put us back too much and we are surprised by an early finish date!! Fingers crossed!
Starting on the stairwell - this is actually the "newell" from the original 1939 staircase. It was in good condition and since we have tried to keep some of the original things in the house, I thought it would be great if we could reuse it... obviously it will be cleaned up and refinished, but it is still original:
Top of the stairs:
Mudroom brick now complete - and the transition from the wood floors and the laundry room tile:
An original door with a crystal knob re-hung in the hallway upstairs:
Desk and shelves added to my nook area... notice the original shiplap that we left on the walls.
E's bathroom with tile and grout finished... you can see both the bathtub and the tile floor:
Guest bathroom tile finished on both the floor and the bathtub:
Starting on the tile work in our shower, the brick will go all the way to the floor and above will be a herringbone pattern (see it on the bench):
Master bathroom floor - herringbone marble - I love this:
Floor of the shower -- adding a little contrast to the bathroom (and the herringbone pattern which will be the top 1/3 of the shower laying on there):
They also floated the patio in the courtyard so they could lay the tile here this week:
Hopefully by the end of the week most of our bathroom will be finished and maybe some more of the wood work done (i.e. stairs, front door, etc.).... as things happen, I will continue to keep you posted! Have a great middle of the week!!
Wednesday, May 22, 2013
Thursday, May 16, 2013
Renovation Raiders...
I feel like an episode of Renovation Raiders is going on at our house this week while I am out of town... my very own HGTV!!! There has been so much going on and progress made. All of the tile looks great - look forward to seeing it all in person on Saturday! The doors came in and they started hanging them yesterday. Lots of pics sent by Brian, my mom and the contractor... which have kept me in the loop with all the details - love it. Looks like they are about to start on the tile in the master bathroom... cannot wait to see how it looks!!
Here is E's bathroom with the mint green accent tiles installed:
And her bathroom floor:
Here is the bathtub in the guest bathroom:
The finishing strip on the side:
And the penny tile floor in the guest bathroom:
The mudroom brick floor:
Almost finished this afternoon:
Laundry tile floor installed:
The doors in the house, ready to be hung:
Hallway upstairs with doors hung:
Doors in the master bathroom:
Molding and baseboards in our master bedroom:
And the wainscotting downstairs in the living room/breakfast room area:
Lots of changes to see when I get home. For now... heading out for the day (on the other side of the world it is already Friday morning) and will be heading home late tonight! Cannot wait to get home to Brian, Little Miss E and see all the exciting things that have taken place at the house this week! Have a great Friday!
Here is E's bathroom with the mint green accent tiles installed:
And her bathroom floor:
Here is the bathtub in the guest bathroom:
The finishing strip on the side:
And the penny tile floor in the guest bathroom:
The mudroom brick floor:
Almost finished this afternoon:
Laundry tile floor installed:
The doors in the house, ready to be hung:
Hallway upstairs with doors hung:
Doors in the master bathroom:
Molding and baseboards in our master bedroom:
And the wainscotting downstairs in the living room/breakfast room area:
Lots of changes to see when I get home. For now... heading out for the day (on the other side of the world it is already Friday morning) and will be heading home late tonight! Cannot wait to get home to Brian, Little Miss E and see all the exciting things that have taken place at the house this week! Have a great Friday!
Wednesday, May 15, 2013
Kitchen Sink... Granite/Marble...Built-Ins... And Tile!!!
Our house is coming together... Pretty quickly the house is transforming and when we go by during the day - a lot of things are going on. I love it!! Last week I went and picked out the actual slabs of granite and marble for the house and they continued to make progress on the trim work and some of the built-ins. This week they are working on tile work in the bathrooms!
I am traveling for work the rest of the week and I know when I come home it is going to look really different! I cannot wait to see it all in person. This is a hard week to be gone from the house because so many of the finish details are being worked on... which has been what I have been working on since we started the project. Not that the placement of plugs, studs and other things has not been of interest... but I have left a lot of that to Brian and he has really left the design details (with his approval) up to me. In any case, I am confident - that when I come home there will be lots of exciting things to see in person! :)
Yesterday, very quickly before my flight out of town -- I went by to see the start of the tile work and to confirm that things were how they were supposed to be... very excited about it all. Brian sent pics from the end of the day of how much progress they had made... both secondary bathrooms had most of the bath tub tile in... and I love it. Have to give credit to Suzanne, who renovated a house in Austin, who gave me the idea to do a herringbone pattern with white subway tiles in the bathroom and it looks great. I was always doing herringbone for the brick floor in the mudroom and likely in the master bathroom, but I am not sure I would have thought of it with white subway tiles -- it looks great, so I am glad she gave me the idea!! E's bathroom is a brick pattern and will have a mint penny tile as the accent. Very happy with how hers looks so far too.
Since Beth asked... here is a picture of the sink... this isn't an actual picture of ours... but figured this one is better than one of it in the box:
Here are the pics of the slabs I picked out last week for the house... unfortunately, the slab for the island did not come out - but it is a black honed/leathered granite to contrast with the carrara in the kitchen.
Pretty sure this one is the polished marble for our bathroom:
And this is a picture of the honed marble for our kitchen:
Granite for secondary bathrooms and laundry room:
Built-ins in one of the secondary bedrooms:
Brian's office with the original hardwood floors all sanded down... cannot believe how good they look!
Attic Access panel is in:
Master bathroom Tub:
Wainscotting and in the nook you can kinda see the desk in E's Room:
And her book shelves for all of her dolls:
Here is the tile in E's bathroom... the strip missing will be mint green penny subway tiles:
And as I mentioned above -- the herringbone subway tile in the guest bathroom:
Lots of progress... I will do my best to post other updates as I get them from Brian. But for now... since I am on the other side of the world... I am going to try and get some rest.
I am traveling for work the rest of the week and I know when I come home it is going to look really different! I cannot wait to see it all in person. This is a hard week to be gone from the house because so many of the finish details are being worked on... which has been what I have been working on since we started the project. Not that the placement of plugs, studs and other things has not been of interest... but I have left a lot of that to Brian and he has really left the design details (with his approval) up to me. In any case, I am confident - that when I come home there will be lots of exciting things to see in person! :)
Yesterday, very quickly before my flight out of town -- I went by to see the start of the tile work and to confirm that things were how they were supposed to be... very excited about it all. Brian sent pics from the end of the day of how much progress they had made... both secondary bathrooms had most of the bath tub tile in... and I love it. Have to give credit to Suzanne, who renovated a house in Austin, who gave me the idea to do a herringbone pattern with white subway tiles in the bathroom and it looks great. I was always doing herringbone for the brick floor in the mudroom and likely in the master bathroom, but I am not sure I would have thought of it with white subway tiles -- it looks great, so I am glad she gave me the idea!! E's bathroom is a brick pattern and will have a mint penny tile as the accent. Very happy with how hers looks so far too.
Since Beth asked... here is a picture of the sink... this isn't an actual picture of ours... but figured this one is better than one of it in the box:
Here are the pics of the slabs I picked out last week for the house... unfortunately, the slab for the island did not come out - but it is a black honed/leathered granite to contrast with the carrara in the kitchen.
Pretty sure this one is the polished marble for our bathroom:
And this is a picture of the honed marble for our kitchen:
Granite for secondary bathrooms and laundry room:
Built-ins in one of the secondary bedrooms:
Brian's office with the original hardwood floors all sanded down... cannot believe how good they look!
Attic Access panel is in:
Master bathroom Tub:
Wainscotting and in the nook you can kinda see the desk in E's Room:
And her book shelves for all of her dolls:
Here is the tile in E's bathroom... the strip missing will be mint green penny subway tiles:
And as I mentioned above -- the herringbone subway tile in the guest bathroom:
Lots of progress... I will do my best to post other updates as I get them from Brian. But for now... since I am on the other side of the world... I am going to try and get some rest.
Thursday, May 9, 2013
More Progress Happening!!!
There has been a lot of progress at the house this week.... and I have lots of pictures to show for it! :) Every time I go to the house now - something new (that is actually noticable) is happening!! Below are pictures from the past few days of the molding throughout the house (base boards/crown/windows), some of the built-ins and the hardwoods...
On Monday I walked in to discover they had begun framing the windows in the kitchen:
And putting up crown molding:
A rod in the coat closet:
Door framing, baseboards and window sills in the sun room:
The beam and molding in the kitchen:
Shelves outside the powder room:
Base boards in the hall closet:
And there is still a place for E to pretend she is going "potty" in the powder room:
Framing of the window in the stairwell - lots of light coming into the house:
As well as beginning to float the bathroom floors.... didn't take another picture, but this has now been completed and is dry:
Starting to float our master bathroom floors:
Original door for closet under the stairs was able to be reused:
Notice the old hardwoods in these picture:
And now check them out... sanded down and starting to match the new ones installed - it is amazing the to see how different they look:
Dining room has been sanded now too:
New built-ins in the play room/den:
And floated floor in the mud room/laundry room area:
My kitchen sink arrived at our current house this week... I am SO excited. Though over time I have changed my mind on some of the fixtures and finishes - my farm house sink has been one thing I have wanted all along:
I am sure there will be lots more pictures and more progress today... cannot wait to see it!
On Monday I walked in to discover they had begun framing the windows in the kitchen:
And putting up crown molding:
A rod in the coat closet:
Door framing, baseboards and window sills in the sun room:
The beam and molding in the kitchen:
Shelves outside the powder room:
Base boards in the hall closet:
And there is still a place for E to pretend she is going "potty" in the powder room:
Framing of the window in the stairwell - lots of light coming into the house:
As well as beginning to float the bathroom floors.... didn't take another picture, but this has now been completed and is dry:
Starting to float our master bathroom floors:
Original door for closet under the stairs was able to be reused:
Notice the old hardwoods in these picture:
And now check them out... sanded down and starting to match the new ones installed - it is amazing the to see how different they look:
Dining room has been sanded now too:
New built-ins in the play room/den:
And floated floor in the mud room/laundry room area:
My kitchen sink arrived at our current house this week... I am SO excited. Though over time I have changed my mind on some of the fixtures and finishes - my farm house sink has been one thing I have wanted all along:
I am sure there will be lots more pictures and more progress today... cannot wait to see it!